Information security for cloud delivery

ISO/IEC 27001
ISO/IEC 27001 certified
The problem
What is usually behind this search
We do not have an office in Makkah
We serve organisations there from our Riyadh office and our engineering hubs in Lahore and Karachi, travelling for the parts of an engagement that need to happen in person.
The three problems we are usually called about are a migration that stalled, a cloud bill that grew faster than usage, and a release process where deploying is an event rather than a routine. They share a cause: infrastructure that was moved rather than redesigned, and automation that was never built because the migration deadline came first.
Cost is the most visible symptom. A cloud bill rising faster than traffic almost always means over-provisioned instances sized for a peak that no longer applies, storage nobody owns, environments running outside working hours, and data transfer nobody has looked at. These are findable and fixable, but only if someone looks.
Capabilities
What we actually deliver
Cloud migration
Assessment, landing zone design, migration in waves, and cutover with a rollback — sequenced so each wave delivers something rather than everything landing at once.
Landing zone and governance
Account structure, network design, identity, logging, guardrails and tagging set up before workloads arrive rather than retrofitted around them.
CI/CD and release automation
Build, test and deployment pipelines with environment promotion and an automated rollback, so a release is a routine rather than a scheduled risk.
Infrastructure as code
Environments defined in code and version controlled, so what is running matches what was reviewed and can be rebuilt.
Cost optimisation
Right-sizing, commitment planning, storage lifecycle, non-production scheduling and a per-team cost view so spend has an owner.
Reliability and observability
Monitoring, tracing, meaningful alerting, tested recovery procedures and a dependency map that reflects the current system.
Local context
Why this is different in Makkah
Makkah's operating problem has no real parallel in commercial technology: extremely high density, a fixed physical envelope, a population that changes completely every few days, and a service window where failure is not recoverable after the fact. Systems here are judged on behaviour under load, not on features.
The commercial base around that is hospitality and pilgrim services — hotels, transport operators, catering, retail and the agencies that package and manage groups. Their systems have to coordinate with permit and scheduling arrangements outside their control, which makes integration and graceful failure far more important than a rich interface.
The seasonal shape also determines how work should be delivered. Nothing significant changes during the season. Delivery windows are the months between, and testing has to simulate a peak that cannot be reproduced in production.
What buyers in Makkah run into
- 01
The system must fail gracefully, because it will be tested at the limit
At peak, some component will saturate. The design question is what happens next: whether the platform sheds optional features and keeps the critical path running, or whether the whole service becomes unavailable. That behaviour has to be designed deliberately; it does not emerge by itself.
- 02
Delivery windows are narrow and fixed
Releases cannot land during the season, so the calendar is set by the season rather than by the project plan. That requires a delivery approach with real staging environments and rehearsed rollbacks, because there is no option to fix forward at the worst moment.
- 03
Coordination happens across organisations, not inside one
A pilgrim's journey crosses several independent operators. No single system owns it end to end, so useful technology here is about clean interfaces and reliable data exchange between parties rather than a comprehensive platform one organisation controls.
How an engagement runs
The stages, and what happens in each
Assess
Inventory workloads, dependencies, data classification and residency constraints before proposing a target.
Design
Landing zone, network, identity and the operating model for who runs what after migration.
Migrate
Move in waves, lowest risk first, with each wave proving the pattern for the next.
Automate
Pipelines, infrastructure as code and monitoring, so the new environment is operable rather than merely running.
Optimise
Cost and performance review once real usage patterns exist, then again after the first quarter.
Regulatory frame
What governs this work
References for buyers. Techbanq does not issue certifications, approvals or compliance determinations — those rest with the authority and its assessors.
The full frame in Saudi Arabia- NCA ECC
The Essential Cybersecurity Controls — the national minimum baseline for government entities and for private operators of critical national infrastructure. The 2024 revision expanded both scope and control depth.
- NCA CCC
Cloud Cybersecurity Controls — the requirements applied to cloud service providers and to the entities consuming their services.
- Aramco SACS-002 / CCC
Saudi Aramco's third-party cybersecurity standard. Vendors are classified into CCC or the on-site CCC+ tier, with audits carried out by firms Aramco authorises.
- PDPL
The Personal Data Protection Law, enforced by SDAIA. Sets lawful basis, transfer, retention and breach-notification duties for anyone processing personal data in the Kingdom.
- SAMA Cyber Security Framework
The mandatory framework for SAMA-regulated entities, organised across governance, risk, operations, third-party security, resilience and compliance.
Technologies
What we work with
Cost
What moves the price
We do not publish fixed prices, because any figure quoted before the scope is known is a guess. These are the variables that actually determine it.
Application readiness
Applications that can move as they are cost far less than ones needing re-architecture to run properly in cloud.
Data volume and residency
Large data sets take time to move, and residency rules may force a specific region or a hybrid design.
Downtime tolerance
A migration allowing a maintenance window is materially cheaper than one requiring near-zero downtime.
Current automation
Where deployment is manual today, building the pipeline is a project in itself alongside the migration.
Common questions
What buyers usually ask
Our cloud bill keeps rising. Where do we start?+
With visibility, then the four usual causes: instances sized for a peak that no longer applies, storage and snapshots nobody owns, non-production environments running around the clock, and data transfer between regions or out to the internet. A first review typically finds a meaningful reduction without touching architecture — but we will not quote a percentage before looking at your account.
Can we move to cloud with data residency requirements?+
Usually, but the classification comes first. Once you know which data classes must stay in-country, the architecture follows: in-country regions or on-premise for the restricted classes, cloud for the rest, and a documented boundary between them. Migrations that skip classification are the ones that get unwound.
How long does a migration take?+
It depends on application count and readiness far more than on data volume. A handful of modern applications can move in weeks. An estate with legacy dependencies, undocumented integrations and a low downtime tolerance takes months and should be sequenced in waves so value arrives before the end.
Other services in Makkah
Related
Cloud and DevOps services in other cities
Discuss cloud and devops in Makkah
Send us the scope as you understand it today, even if it is incomplete, and we will tell you what we need to know before giving an estimate.
What happens next
- 1We reply within one business day.
- 2A 30-minute scoping call with a senior consultant.
- 3A written proposal with scope, team, and timeline.
Or reach us directly
