Fixed price feels like the safe choice because the number is settled, and time-and-materials feels risky because it is open. But each only protects the buyer when the work fits its assumption: fixed price when the scope is genuinely known, time-and-materials when it is not and honesty about that is worth more than a false cap. Choosing by which feels safer, rather than by how well the requirements are understood, is how the reassuring contract becomes the expensive one.

Serving Saudi Arabia from our Riyadh office and our engineering hubs in Lahore and Karachi

Project team in a working session around a meeting table
  1. 01

    Market

    Saudi Arabia

  2. 02

    Written for

    COO, Procurement

  3. 03

    Decision

    Choose a contracting model for a software engagement

  4. 04

    Languages

    EN · AR

Information security for software delivery

  • ISO

    ISO/IEC 27001

    ISO/IEC 27001 certified

Certifications & registrations

The two models

What each contract really does when the scope moves

The difference is not who is cheaper; it is who carries the risk of the unknown, and what each model does the moment a requirement turns out to be different from the assumption it was signed on.

OptionWho carries the risk of the unknownWhat it assumes about the scopeHow it behaves when requirements changeWhat it costs you to manageBest for
Fixed priceThe supplier, on paper. In practice they price the risk into the figure, so you pay for it whether or not it materialises.That the scope is known and stable. The contract is only as sound as that assumption, and the assumption is rarely tested before signing.Every change becomes a variation to negotiate, which turns collaboration into a contract dispute and slows the work it was meant to protect.Less day to day, more at the boundaries. You manage the contract and the change requests rather than the hours.Work whose scope is genuinely well defined and unlikely to move — a defined migration, a bounded feature, a rebuild of something that already exists.
Time and materialsThe buyer, openly. You pay for the work done, so the risk of the unknown is visible rather than priced into a premium you cannot see.That the scope will be discovered as the work proceeds, which is the honest assumption for anything genuinely new.A change is absorbed by re-prioritising the backlog, so the work bends without a renegotiation each time.More: you need a cap, a regular cadence and a visible backlog to keep it accountable, because openness without control is where it earns its bad reputation.Work where the scope is still being discovered — a new product, an evolving requirement, or anything where the right answer is learned by building.

The real variable

Both models are honest; they price certainty differently

Fixed price is not safer than time-and-materials in general; it is safer for a specific condition, which is that the scope is genuinely known. When it is, a fixed figure caps your risk and the supplier who priced it accurately carries the rest — a good outcome for a buyer. The trouble is that fixed price is most attractive exactly when it is least appropriate: on a new or vague project, where the certainty of a single number is emotionally reassuring and technically impossible, because you cannot fix the price of work nobody can yet describe.

What happens then is predictable. A supplier asked to fix a price on unclear scope does one of two things: pads the figure heavily to cover the unknown, so you overpay for risk that may not occur, or bids tight to win and then recovers the margin through change requests, so every conversation about what the software should do becomes a negotiation about what it will cost. Neither serves the buyer, and both come from forcing a fixed price onto work that did not qualify for one. Time-and-materials, run with a cap and a visible backlog, is not the risky option here — it is the honest one, and it keeps the relationship pointed at the product rather than the contract.

When the cap costs more

When fixed price quietly became the more expensive option

Illustrative engagement

A buyer takes a new internal product to two suppliers. One quotes a firm fixed price that looks reassuring against the other's open-ended time-and-materials proposal, and procurement prefers the certainty of the number. The scope, though, is a first-of-its-kind workflow that nobody has built before.

  1. 01Because the scope could not be pinned down, the fixed-price supplier priced the risk in and interpreted the specification narrowly, so anything discovered mid-project fell outside the contract.
  2. 02Each discovery — and a new product is mostly discovery — became a change request with its own price and delay, and the reassuring single number grew through additions nobody could have listed at signing.
  3. 03The team spent its energy on contract variations instead of on the product, and the relationship turned adversarial exactly when it most needed to be collaborative.

The fixed price ended higher than the capped time-and-materials proposal would have, and later than it promised, because the model assumed a certainty the work never had. The other supplier's open-ended proposal, with a cap and a visible backlog, would have absorbed the same discoveries without a dispute over each one. The reassuring contract was the expensive one, and the tell was there before signing: the scope did not qualify for a fixed price.

Our role

How we structure a contract around what is actually known

  1. 01

    Test the certainty first

    Before proposing a model, we establish how well the scope is really known — and we will say a fixed price is inappropriate for work that is still being discovered, even when a fixed price is what was asked for.

  2. 02

    Fix what is fixable

    Where a phase is genuinely well defined, we fix its price; where the next phase depends on what the first one teaches, we keep it time-and-materials with a cap — so the buyer gets certainty on the known part without buying a false cap on the unknown.

  3. 03

    Controls that keep T&M accountable

    When time-and-materials is right, we run it with a cap, a regular cadence and a backlog you can see and re-order — because the model earns its bad reputation only when it is run without those, and with them it is the more transparent of the two.

How firm your requirements really are is yours to know, and worth being honest with yourself about; we match the contract to that honesty — fixing the price of what is settled, keeping the rest flexible and controlled — so the model protects you rather than merely reassuring you.

Common questions

What buyers ask

Isn't fixed price always the safer choice for us?+

Only when the scope is genuinely known. A fixed price caps your exposure on well-defined work, and there it is a good deal — the supplier carries the risk they priced. On unclear or new work it stops being protection, because a supplier cannot commit to a number for something nobody can yet describe, so they either pad the figure to cover the unknown or bid low and recover through change requests. Both leave you worse off than an honest time-and-materials arrangement with a cap. The safety of fixed price comes entirely from the certainty of the scope, so the question to ask is not "which model is safer" but "how well do we actually know what we want".

How do we stop time and materials from running away?+

With three controls, and time-and-materials without them is what gives the model its reputation. First, a cap: an agreed ceiling the supplier cannot pass without a conversation, so open-ended does not mean unlimited. Second, a cadence: a regular review — usually every couple of weeks — where you see what was done, what it cost and what is next, so a surprise is caught early rather than at the invoice. Third, a visible, ordered backlog you control, so you can always redirect the spend to the most valuable work and stop when the value runs out. Run that way, time-and-materials is more transparent than fixed price, because you see exactly what you are paying for as it happens rather than trusting a number set before the work began.

Can one project use both models?+

Yes, and it is often the best structure, because most projects contain a part that is well understood and a part that is not. Phase the work: fix the price of the discovery or the defined groundwork, whose scope you can pin down, and hold the build that depends on what discovery reveals as time-and-materials with a cap. That way you buy certainty where certainty exists and flexibility where it does not, instead of forcing one model across both and getting the wrong protection on half the project. The boundary between the phases is worth drawing deliberately, at the point where the work stops being known and starts being learned.

A short scoping conversation that establishes how well the requirements are actually known, which is what decides the contract model rather than which one feels safer to sign.

Match the contract to the work