Techbanq

Software engineering · Saudi Arabia

Software development for Saudi enterprises

Plan for the integration between new and existing systems, accountable technical decisions and long-term support after go-live. We engineer for those three points as deliberately as we engineer the features.

We work on systems that carry transactions, regulated records or plant operations — where a defect is an incident rather than a ticket, and where the integration surface is larger than the application itself.

Serving Saudi Arabia from our Riyadh office and our engineering hubs in Lahore and Karachi

Market
Saudi Arabia
Written for
CIO, CTO, Head of Digital
Decision
Choose an engineering partner for a system the business depends on

Information security for software delivery

  • ISO

    ISO/IEC 27001

    ISO/IEC 27001 certified

Certifications & registrations

The real risk

The integration surface is usually larger than the application

We do not have an office in Saudi Arabia

We serve organisations there from our Riyadh office and our engineering hubs in Lahore and Karachi, travelling for the parts of an engagement that need to happen in person.

A replacement system for a mid-sized Saudi enterprise typically has to speak to an ERP, an identity provider, a payment or billing platform, a document store, one or two national platforms, and between three and ten systems that exist only because someone built them to solve a problem in 2014. The application itself is the part everyone can picture. The surface where it meets everything else is where the schedule goes.

This is why our first fixed-price stage is almost always discovery against the real systems rather than a functional specification. We connect to the interfaces, read the actual payloads, and find out which of the documented APIs still behave as documented. That work is unglamorous and it routinely changes the plan — which is the point of doing it before the plan is committed rather than after.

The second recurring failure is ownership. Enterprise builds stall waiting for decisions that have no named owner — which system is authoritative for customer data, who accepts a change to the approval chain, what happens to records that fail migration. We put those decisions on a register in the first two weeks with a name and a date against each one, because a decision without an owner becomes a delay with no cause.

What we build

Six classes of system

Grouped by what the system does for the business, because that is what determines the architecture — not by the language it is written in.

01

Custom enterprise applications

Systems built because the packaged options force the business to change a process that is genuinely a differentiator. Usually transaction-carrying, usually integrated with an ERP, always with an audit trail that survives a review.

02

Product and SaaS engineering

Multi-tenant platforms with the parts that only matter at the second customer: tenant isolation, configuration without forking, a release process that ships to some tenants and not others, and usage data that supports a commercial model.

03

APIs and integration

API design with versioning decided before the first consumer, gateway policy for authentication and rate limits, and integration patterns chosen for the failure mode — synchronous where a user is waiting, queued where the downstream system is unreliable.

04

Workflow and case systems

Approval chains, exception handling, SLA tracking and the reporting a regulator or an internal auditor asks for. The hard part is rarely the happy path — it is what the system does when a step is skipped, delegated or reversed.

05

Legacy modernisation

Incremental replacement rather than a rewrite: put a seam around the part being replaced, run both, move traffic, retire. Rewrites of systems nobody fully understands are the most reliable way to spend two years and arrive back where you started.

06

Data platforms and internal tools

The reporting layer, the operational console, the reconciliation tool that three people run the business from. Small systems with disproportionate operational weight, and the ones most often left undocumented.

How the work runs

Five stages, each with something you can hold

Every stage ends in an artefact that has value even if the next stage never starts. That is deliberate — it is what makes it possible to stop.

STAGE 01

Discovery against the real systems

Two to four weeks connecting to the actual interfaces, profiling the data, and mapping which system is authoritative for what. Integration map, data-quality findings, and a decision register with named owners.

STAGE 02

Architecture and sequencing

The design, the non-functional requirements written as testable numbers, and the order of delivery chosen so the riskiest assumption is tested first. Architecture document, NFR set, and a release plan with what is in each increment.

STAGE 03

Build in increments

Working software into a staging environment on a fixed cadence, with the pipeline, the automated tests and the observability built alongside rather than at the end. Deployable increments, a test suite that runs on every commit, and dashboards that already work.

STAGE 04

Cutover

Migration rehearsed against production-shaped data, a documented rollback, and a parallel-run period where both systems are live and reconciled. Cutover runbook, reconciliation report, and a rollback that has actually been tested.

STAGE 05

Handover and support

Documentation written for the team that will hold it, sessions with your engineers on the parts that are not obvious, and a support arrangement that reduces over time by design. Runbooks, architecture decision records, and a named internal owner for each subsystem.

Engineering governance

What "enterprise-grade" has to mean concretely

The phrase is used loosely. These are the specific controls we run, what each one is for, and the evidence it produces — so you can ask any supplier the same questions.

Architecture decisions recorded

Every significant choice is written down with the alternatives considered and the reason, at the time it is made.

Evidence produced: ADR set in the repository, readable by an engineer who joins in year three.

Automated test coverage on the paths that matter

Coverage targeted at transaction integrity, authorisation and integration contracts, not at a percentage.

Evidence produced: Test suite in CI, contract tests against every integration, and a failing build that blocks release.

Security in the design, not after it

Threat modelling at architecture stage, dependency scanning in the pipeline, and secrets held outside the codebase from day one.

Evidence produced: Threat model, scan results on every build, and a secrets store with access logs.

Non-functional requirements as numbers

Response time, concurrent users, recovery objectives and retention written as figures that can be tested and failed.

Evidence produced: Load-test results against the stated numbers, before go-live rather than after the complaint.

Observability from the first increment

Structured logs, traces across service boundaries, and alerts on the business event rather than on CPU.

Evidence produced: Dashboards and alerting that are already in use by the time the system goes live.

Handover treated as a deliverable

Documentation and knowledge transfer are scoped, scheduled and accepted like any other work item.

Evidence produced: Runbooks, a named internal owner per subsystem, and a support taper agreed in writing.

Integration surface

What we usually have to connect to

Grouped by system class rather than by vendor. The question a buyer is really asking is whether we have met their estate before.

Core business systems

  • SAP
  • Oracle EBS
  • Microsoft Dynamics
  • Odoo
  • Core banking platforms

Identity and access

  • Microsoft Entra ID
  • Keycloak
  • OAuth 2.0 / OIDC
  • SAML
  • Active Directory

Data and messaging

  • PostgreSQL
  • SQL Server
  • Oracle Database
  • Apache Kafka
  • Redis
  • Debezium

Application platform

  • Java / Spring
  • .NET
  • Node.js
  • Python
  • React
  • React Native

Delivery and runtime

  • Kubernetes
  • Docker
  • Terraform
  • GitHub Actions
  • Azure DevOps
  • AWS
  • Azure

Engagement shape

Replacing a system nobody can safely turn off

Illustrative engagement — not a named client

An operations system built in-house a decade ago carries a process the business depends on daily. The original engineers have left, the documentation is a wiki page from 2017, and every change now takes weeks because nobody is confident about what else it touches.

  1. 01Instrument the existing system first to find out what is actually used. In systems of this age, a substantial share of the screens usually turn out to be dead, which changes the scope of the replacement before it is scoped.
  2. 02Put a seam around one bounded capability, build its replacement behind the same interface, and run both against live traffic with output comparison until they agree.
  3. 03Move traffic to the new component, retire the old path, and repeat. The legacy system shrinks rather than being switched off, so there is no single day on which everything has to work.

The pattern produces slower headline progress and a materially lower chance of the outcome everyone fears. It also means the programme can be paused at any increment without leaving the business between two systems.

Common questions

What buyers ask

Do you work fixed-price or time and materials?+

Discovery is fixed-price, because its scope is knowable. Build stages are usually time and materials against a fixed scope per increment, which gives you a cost ceiling per release without pretending the whole programme can be priced before the integration surface is known. A fixed price for a scope nobody has validated is a fixed price for a change-request negotiation.

Who owns the code and the intellectual property?+

You do, from the first commit. Work is done in your repository where you have one, or in a repository transferred to you at each milestone where you do not. We do not retain licence-back rights over client systems, and we do not build client work on top of components you cannot use without us.

Where does the engineering team actually sit?+

Client-facing work — discovery, architecture review, workshops, go-live — happens on site in the Kingdom. The build capacity sits in our engineering hubs in Lahore and Karachi, working Saudi hours. We say so plainly rather than implying a larger local headcount than we have, because it changes how you should plan workshops and it is the first thing a serious buyer checks.

What happens to the system after handover?+

The default is a support arrangement that tapers: full cover through the first release cycles, then reducing as your team takes the subsystems over. Handover is a scoped deliverable with documentation, architecture decision records and named internal owners — not a final invoice. Where you would rather we run it long-term, that is a managed-service arrangement priced separately.

Can you work alongside our existing in-house team?+

Yes, and it is the arrangement that produces the best long-term outcome where the in-house team will hold the system. The structure that works is shared ownership of the codebase with one architecture authority — not two teams each building half. Where the split is ambiguous the code diverges within weeks, so we agree the boundary and the review process before the first sprint.

Next step

Discuss your system

A technical working session on the system you are planning or the one that is not holding up — architecture, integration surface, and an honest read on scope and sequencing. Not a proposal meeting.

Discuss your system

What happens next

  1. 1We reply within one business day.
  2. 2A 30-minute scoping call with a senior consultant.
  3. 3A written proposal with scope, team, and timeline.

Or reach us directly

By submitting this form you agree to our Terms of Use and Privacy Policy.