The challenge
The plant director had identified a measurable energy performance gap between day and night shifts — but the cause was not established, and no systematic approach to closing it existed. Cement is a process industry where small drifts in raw mix, kiln temperature, or mill feed translate directly into energy bills and clinker quality variation. The plant had a competent control room and a long-established operator culture. The question was whether that experience differential could be systematically narrowed without replacing the operator culture that made the plant run well.
Discovery
A two-month process audit identified the specific cause: the gap was almost entirely attributable to setpoint discipline during disturbance recovery. Night-shift operators responded to disturbances with the right intent but with setpoints that were slightly more conservative than the day-shift reference — losing 1.4% in energy efficiency during the recovery hour. The opportunity was not a new control philosophy or a change in operating approach. It was making the day-shift recovery technique consistently visible and available to every shift.
Our approach
Process model design: trained a process advisor on three years of kiln and mill operating data, with the day-shift operating envelope as the reference for stable disturbance recovery
DCS integration: surfaced the advisor as a recommendation layer inside the existing DCS — every recommended setpoint includes the expected energy and quality impact, with the operator retaining the decision
Fuel optimisation programme: built a fuel mix optimiser that adjusts within the environmental permit envelope and updates on each fuel-quality measurement
Governance and cross-shift review: established a weekly cross-shift review where operators and process engineers review the advisor's recommendations and outcomes — building confidence in the system before increasing reliance on it
The Outcome
The engagement delivered a process advisor running alongside the existing DCS that surfaces setpoint and fuel-mix recommendations to the control-room operator. Every recommendation carries the expected impact, and the operator retains the decision. Cross-shift variance narrowed because every shift gained the same view of what the best-performing recovery technique looks like.
The results
“The advisor did not change our operators. It made the best of them available to all of them. That is what closed the gap between shifts.”