Information security for software delivery

ISO/IEC 27001
ISO/IEC 27001 certified
The problem
What is usually behind this search
We have an office in Riyadh
Our team there works alongside our engineering hubs in Lahore and Karachi.
Most corporate sites in this region fail on two things at once: they are slow on the mobile connections most visitors actually use, and their Arabic version is a mirrored copy of the English rather than a site designed to be read right to left. Both are visible to the visitor and both affect search performance.
The third failure is maintenance. A site that needs a developer to change a headline stops being updated within a year. Whoever owns the content needs to be able to change it without a release, or the site quietly goes stale.
Capabilities
What we actually deliver
Corporate and enterprise sites
Sites structured around what a buyer needs to evaluate you, with the content model and governance to keep them current.
Arabic and bilingual sites
Right-to-left layouts designed rather than flipped, Arabic typography that reads properly, and content that is localised rather than translated.
Commerce
Storefronts integrated with regional payment methods, delivery providers and the back-office systems that hold stock and pricing.
Web applications
Customer and partner portals — account, ordering, tracking, self-service — built on the same systems your staff use rather than a parallel copy.
Performance and Core Web Vitals
Server rendering or static generation, image and font optimisation, and a JavaScript budget enforced rather than aspired to.
Technical SEO foundations
Clean URL structure, correct canonical and hreflang signals, structured data that matches the visible page, and sitemaps generated from the content rather than maintained by hand.
Local context
Why this is different in Riyadh
Riyadh concentrates the two buyer types that set the tone for the whole market: government and semi-government entities, and the headquarters functions of the large Saudi corporates. Both buy differently from an operating site. Procurement is more formal, the security review is longer, and the system is expected to integrate with national platforms rather than stand alone.
The financial cluster around the King Abdullah Financial District adds a third pattern. Banks, insurers and the newer payment firms are supervised by the Saudi Central Bank, so their technology programmes carry a resilience and evidence burden that a comparable retail or logistics programme does not.
The practical consequence for delivery is that Riyadh work is rarely purely technical. A typical engagement has a security architecture thread, an integration thread against a government or sector platform, and a documentation thread that has to survive review long after the build team has moved on.
What buyers in Riyadh run into
- 01
Integration with national platforms is the long pole
Riyadh systems rarely stand alone. They authenticate against national identity services, exchange data with sector platforms, and inherit those platforms' availability and change calendars. Schedules that ignore this consistently slip, because the integration dependency is not under the programme's control.
- 02
Security review arrives after the architecture is fixed
The common failure pattern is a solution designed for functionality, then presented to the security function late. Rework at that point is expensive because it touches network design, identity and data placement at once. Bringing the control mapping into the design phase costs weeks; retrofitting it costs quarters.
- 03
Capability transfer is part of the contract
Riyadh buyers increasingly require that the internal team can operate the system without the vendor. That changes how the work should be run — documentation, runbooks and paired working are deliverables in their own right, not a closing formality.
How an engagement runs
The stages, and what happens in each
Plan
Audience, content structure, and the technical requirements that follow from both.
Design
Interface design in both reading directions from the start, not English first and Arabic afterwards.
Build
Implementation with performance budgets and accessibility checked as work proceeds rather than at the end.
Populate
Content loaded and localised, with the client's team trained on the editing model before launch.
Launch and measure
Redirects, analytics, search console setup and a performance baseline recorded on day one.
Regulatory frame
What governs this work
References for buyers. Techbanq does not issue certifications, approvals or compliance determinations — those rest with the authority and its assessors.
The full frame in Saudi Arabia- NCA ECC
The Essential Cybersecurity Controls — the national minimum baseline for government entities and for private operators of critical national infrastructure. The 2024 revision expanded both scope and control depth.
- NCA CCC
Cloud Cybersecurity Controls — the requirements applied to cloud service providers and to the entities consuming their services.
- Aramco SACS-002 / CCC
Saudi Aramco's third-party cybersecurity standard. Vendors are classified into CCC or the on-site CCC+ tier, with audits carried out by firms Aramco authorises.
- PDPL
The Personal Data Protection Law, enforced by SDAIA. Sets lawful basis, transfer, retention and breach-notification duties for anyone processing personal data in the Kingdom.
- SAMA Cyber Security Framework
The mandatory framework for SAMA-regulated entities, organised across governance, risk, operations, third-party security, resilience and compliance.
Technologies
What we work with
Cost
What moves the price
We do not publish fixed prices, because any figure quoted before the scope is known is a guess. These are the variables that actually determine it.
Page and template count
Distinct templates drive effort far more than page count. Fifty pages on four templates is a small project.
Languages
A second language adds design, content, testing and ongoing editorial work — it is not a translation line item.
Integrations
Payments, delivery, CRM and stock integrations each carry design and failure-handling work beyond the connection itself.
Content readiness
Projects most often slip on content, not code. Where copy and images have to be produced, that should be planned as a workstream.
Common questions
What buyers usually ask
Why is our Arabic site worse than the English one?+
Usually because it was produced by mirroring the English layout and running the copy through translation. Right-to-left reading changes where the eye goes, Arabic typography needs different line height and sizing to be comfortable, and translated marketing copy reads as translated. A site that works in Arabic is designed in Arabic.
Can our team update the site without a developer?+
That should be the default. We define a content model that covers the changes you will actually make — text, images, people, news, case studies — and train the owner before launch. Structural changes still need a developer, and that is the correct boundary.
Will a redesign hurt our search rankings?+
It can, if URLs change without redirects, content is cut, or the new site is slower. Done properly — a redirect map from every old URL, content preserved or improved, performance measured before and after — a redesign usually helps. The risk comes from treating it as a visual project rather than a technical one.
Other services in Riyadh
Related
Discuss web development in Riyadh
Send us the scope as you understand it today, even if it is incomplete, and we will tell you what we need to know before giving an estimate.
What happens next
- 1We reply within one business day.
- 2A 30-minute scoping call with a senior consultant.
- 3A written proposal with scope, team, and timeline.
Or reach us directly
