Information security for software delivery

ISO/IEC 27001
ISO/IEC 27001 certified
The problem
What is usually behind this search
We do not have an office in NEOM
We serve organisations there from our Riyadh office and our engineering hubs in Lahore and Karachi, travelling for the parts of an engagement that need to happen in person.
Custom software is the right answer less often than software firms suggest. If a packaged product fits, buying it is almost always cheaper across the system's life. The case for building is when the process being supported is genuinely how the organisation competes, or when the required integration between existing systems is the actual product.
The second problem is that most failed custom projects did not fail technically. They failed because the requirement was written by people who do not do the work, the scope grew without the timeline moving, or the system was delivered to a team that had never seen it before go-live. Those are process failures, and they are avoidable.
Capabilities
What we actually deliver
Enterprise applications
Operational systems built around a specific business process — case management, field operations, project control, scheduling, approvals.
Systems integration
Making existing systems work together reliably — interface design, message handling, reconciliation and the error paths most integrations skip.
API and platform engineering
Interfaces designed to be consumed by other teams and partners, with versioning, authentication, rate limiting and documentation treated as part of the product.
Legacy modernisation
Moving capability off an old system incrementally behind a stable interface, so the organisation is never dependent on a single cutover succeeding.
Product engineering
Building a product from first release to a scale where it needs multi-tenancy, usage metering and an operations model.
Arabic and bilingual systems
Right-to-left interfaces built rather than mirrored, Hijri and Gregorian date handling, and Arabic text, names and search that behave correctly at the data layer.
Local context
Why this is different in NEOM
NEOM is unusual in this market because it has no legacy estate. There is no thirty-year-old core system to integrate with, no accumulated technical debt, and no established operating convention to work around. That removes the constraint most Saudi programmes spend their effort on — and replaces it with a harder one.
The harder constraint is that everything is decided at once. Identity, data architecture, network design, operating model and vendor strategy all have to be settled before there is operational experience to inform them. Decisions made early become expensive to reverse once dependent systems accumulate on top.
Work in this environment tends to be architectural rather than remedial: setting the standard that later systems will inherit, and building the first implementations that prove the standard works. The value is in getting the foundations right, because the cost of a wrong foundation compounds with every system built on it.
What buyers in NEOM run into
- 01
Architecture decisions are made before operational evidence exists
Without a running operation to learn from, foundational choices rest on assumption. The defensible approach is to design for reversibility where the evidence is thin — open interfaces, portable data formats, no single-vendor lock on a core function — rather than to pick confidently and hope.
- 02
Many contractors, one architecture
Greenfield programmes run dozens of delivery partners in parallel, each with its own preferred stack. Without an enforced integration and data standard, the result is a set of islands that has to be re-integrated later at far higher cost than specifying it up front.
- 03
Security has to be designed in, because there is nothing to retrofit onto
A greenfield environment is the one chance to build identity, segmentation and monitoring correctly from the start. Once dependent systems are live, changing the identity model or the network boundary becomes a programme in itself.
How an engagement runs
The stages, and what happens in each
Discover
Observe how the work is done today, with the people who do it, before writing a requirement.
Design
Architecture, data model, integration contracts and the security and compliance constraints, agreed before build.
Build
Delivered in increments a user can see and react to, not a single reveal at the end.
Test
Automated tests, real-data trials and load testing where volume matters, before users depend on it.
Launch
Phased rollout with a rehearsed rollback, and support present through the first operating cycle.
Hand over
Documentation, runbooks and paired working so your team can operate and change the system themselves.
Regulatory frame
What governs this work
References for buyers. Techbanq does not issue certifications, approvals or compliance determinations — those rest with the authority and its assessors.
The full frame in Saudi Arabia- NCA ECC
The Essential Cybersecurity Controls — the national minimum baseline for government entities and for private operators of critical national infrastructure. The 2024 revision expanded both scope and control depth.
- NCA CCC
Cloud Cybersecurity Controls — the requirements applied to cloud service providers and to the entities consuming their services.
- Aramco SACS-002 / CCC
Saudi Aramco's third-party cybersecurity standard. Vendors are classified into CCC or the on-site CCC+ tier, with audits carried out by firms Aramco authorises.
- PDPL
The Personal Data Protection Law, enforced by SDAIA. Sets lawful basis, transfer, retention and breach-notification duties for anyone processing personal data in the Kingdom.
- SAMA Cyber Security Framework
The mandatory framework for SAMA-regulated entities, organised across governance, risk, operations, third-party security, resilience and compliance.
Technologies
What we work with
Cost
What moves the price
We do not publish fixed prices, because any figure quoted before the scope is known is a guess. These are the variables that actually determine it.
Integration count
Each system the new one has to talk to adds design, testing and failure-handling work. Integrations are usually underestimated.
Requirement clarity
A well-understood process is cheaper to build for than one being defined during the project. Discovery is the cheaper place to resolve that.
Compliance and audit requirements
Systems that must produce audit evidence, enforce segregation of duties or meet a control framework carry additional design and testing effort.
Users and languages
More user roles means more permission logic and more testing. Bilingual Arabic and English interfaces add design, content and testing work.
Scale and availability
A system for fifty internal users and one for a national service are different engineering problems, even with identical features.
Common questions
What buyers usually ask
Should we build or buy?+
Buy if a packaged product covers the process reasonably well — it will cost less over the system's life even after configuration. Build when the process is genuinely specific to how you operate, when integration between what you already run is the real requirement, or when every product evaluated needs so much modification that you are effectively building anyway. We will tell you when we think buying is the better answer.
Who owns the source code?+
You do. Code is delivered into your repositories as it is written, not at the end. If the relationship ends, you keep a working system and the ability to hand it to someone else.
How do you handle scope changes?+
By pricing them and showing the timeline effect before they are accepted, rather than absorbing them quietly and missing a date. Some change is normal and healthy; what causes projects to fail is change that is agreed without anyone adjusting the plan.
Other services in NEOM
Related
Custom software development in other cities
Discuss custom software development in NEOM
Send us the scope as you understand it today, even if it is incomplete, and we will tell you what we need to know before giving an estimate.
What happens next
- 1We reply within one business day.
- 2A 30-minute scoping call with a senior consultant.
- 3A written proposal with scope, team, and timeline.
Or reach us directly
