- Market
- Saudi Arabia
- Written for
- CISO, CIO, Procurement
- Decision
- Build the documentation and evidence set the CCC audit examines
- Languages
- EN · AR
Credentials for Aramco compliance
NCA registration
Registered cybersecurity service provider

Aramco CCC
CCC certified

ISO/IEC 27001
ISO/IEC 27001 certified
The artefact set
Four artefact families the CCC audit opens first
Each family fails in its own characteristic way, and each failure is visible to you before it is visible to the auditor — if someone looks.
Policies and procedures
Current, approved, owned and versioned — and written for your organisation rather than downloaded. An auditor recognises a template on sight, and a policy that names departments you do not have is worse than a modest one you follow.
Network diagrams
Drawn from the estate as it runs — segments, boundaries, remote access paths and third-party connections included — and dated, because the first thing an auditor does with a diagram is test it against reality.
Asset inventories
Hardware, software, accounts and data stores, each with an owner and a location, generated from discovery tooling rather than maintained by hand. The inventory is the artefact most other evidence silently depends on.
Operating records
The trail that shows controls ran: patch reports, access reviews, training completion, incident exercises. Documents claim; records demonstrate, and the audit weighs the second kind.
The mapping
Mapping every CCC artefact to the SACS-002 requirement it satisfies
The single highest-value document in the set is the mapping matrix: one row per requirement in your scope, naming the artefact that satisfies it, where that artefact lives, and who owns it. It costs a few days to build and it changes the character of the audit — the auditor works down a list instead of asking your team to translate requirements into filenames under time pressure.
The matrix is also your own completeness check. A requirement whose row is empty is a gap found before the audit; an artefact no row points to is either serving a purpose nobody remembers or missing its mapping. Both discoveries are cheap now and expensive later, which is why the matrix is built early and maintained, not assembled the week before.
One discipline keeps the whole set honest: every artefact carries a date, an owner and a version, and anything that describes the estate is regenerated close to the audit rather than certified from memory. A current, modest document set beats an impressive stale one in every audit we have prepared clients for.
Assembly
Assembling a CCC evidence set that survives auditor scrutiny
Inventory what exists
Collect every candidate document and record, however scattered, and grade each: current and accurate, salvageable with an update, or to be rebuilt. Most suppliers hold more than they think and trust more of it than they should. A graded artefact inventory.
Rebuild against the estate
Diagrams and inventories are regenerated from discovery and configuration, policies are rewritten to match actual practice, and each finished artefact takes its place in the mapping matrix. Artefacts that describe this estate, this quarter.
Cold-read the set
Someone who did not build the pack navigates it by the matrix alone, requirement by requirement. Anywhere they stall, the auditor would have stalled — the index, not the reader, gets fixed. A pack that answers questions without an escort.
Our role
Preparing the CCC paperwork, and where the authorised audit firm takes over
- 01
Producing the artefacts
Policies, diagrams, inventories and the operating-record exports are drafted, generated and checked by us with your teams, against the published requirement set.
- 02
Owning the mapping matrix
The requirement-to-artefact matrix is built at the start, kept current as artefacts land, and used as the completeness check before anything is submitted.
- 03
Leaving it maintainable
Each artefact gets an owner and a refresh trigger, so the set stays current for the certificate's renewal instead of decaying the day the audit ends.
The examination of this evidence, and the certificate that may follow it, belong to an audit firm Saudi Aramco authorises — we build the set that examination reads, and nothing we produce is itself a certification.
The requirements the documentation answers are Saudi Aramco's, published in its third-party manual; where the manual and any advice differ, the manual governs. Source
Common questions
What buyers ask
Our policies exist but were written years ago. Will they pass a CCC audit?+
Age alone is not the problem — accuracy is. A policy that still describes how you work needs an approval refresh and a version stamp; one that describes a company you no longer are needs rewriting, because the audit tests documents against practice and records. The graded inventory at the start of the engagement sorts your set into exactly these categories before any effort is spent.
How detailed do network diagrams need to be for the CCC evidence set?+
Detailed enough to show the security-relevant truth: segments and their boundaries, where Aramco-related data and connectivity sit, remote access paths, and every third-party connection. A diagram of every switch port is unmaintainable and goes stale in weeks; a diagram that hides a connection is a finding. The working standard is that an auditor holding the diagram and your firewall rules should find no surprises in either.
How current must the asset inventory be on the day of the CCC audit?+
Current enough that a sample check passes: the auditor picks entries and finds the assets, and picks assets and finds the entries. In practice that means the inventory is generated from discovery tooling shortly before the audit and reconciled against procurement and decommissioning since — not that a spreadsheet was last saved recently. An inventory process that regenerates on a cadence is itself evidence for more than one requirement.
In this cluster
Next step
Build the CCC evidence set
A complete, current CCC evidence set where every artefact names the requirement it satisfies and matches the estate it describes.
Build the CCC evidence set
What happens next
- 1We reply within one business day.
- 2A 30-minute scoping call with a senior consultant.
- 3A written proposal with scope, team, and timeline.
Or reach us directly
