Information security for cloud delivery

ISO/IEC 27001
ISO/IEC 27001 certified
The problem
What is usually behind this search
We do not have an office in Pakistan
We serve organisations there from our Lahore headquarters and our Karachi hub, travelling for the parts of an engagement that need to happen in person.
The three problems we are usually called about are a migration that stalled, a cloud bill that grew faster than usage, and a release process where deploying is an event rather than a routine. They share a cause: infrastructure that was moved rather than redesigned, and automation that was never built because the migration deadline came first.
Cost is the most visible symptom. A cloud bill rising faster than traffic almost always means over-provisioned instances sized for a peak that no longer applies, storage nobody owns, environments running outside working hours, and data transfer nobody has looked at. These are findable and fixable, but only if someone looks.
Capabilities
What we actually deliver
Cloud migration
Assessment, landing zone design, migration in waves, and cutover with a rollback — sequenced so each wave delivers something rather than everything landing at once.
Landing zone and governance
Account structure, network design, identity, logging, guardrails and tagging set up before workloads arrive rather than retrofitted around them.
CI/CD and release automation
Build, test and deployment pipelines with environment promotion and an automated rollback, so a release is a routine rather than a scheduled risk.
Infrastructure as code
Environments defined in code and version controlled, so what is running matches what was reviewed and can be rebuilt.
Cost optimisation
Right-sizing, commitment planning, storage lifecycle, non-production scheduling and a per-team cost view so spend has an owner.
Reliability and observability
Monitoring, tracing, meaningful alerting, tested recovery procedures and a dependency map that reflects the current system.
Local context
Why this is different in Pakistan
Techbanq's global headquarters is in Lahore and our engineering and delivery hub is in Karachi. That is not a back-office arrangement bolted onto a Gulf business — it is where the company is from, and it is why we can put named senior engineers on a Saudi or UAE programme at a cost structure a purely Gulf-based firm cannot match.
Pakistan's software sector has depth in the areas that matter for enterprise work: backend and platform engineering, cloud and DevOps, data engineering, mobile, and increasingly applied machine learning. The universities produce a large annual cohort, and the established firms have two decades of export delivery experience behind them.
The honest caveat is that quality varies enormously. The market contains genuinely excellent engineering organisations and a long tail of body shops. A buyer evaluating Pakistani delivery should assess the specific team, not the country — which is the same advice we would give about any offshore market.
How an engagement runs
The stages, and what happens in each
Assess
Inventory workloads, dependencies, data classification and residency constraints before proposing a target.
Design
Landing zone, network, identity and the operating model for who runs what after migration.
Migrate
Move in waves, lowest risk first, with each wave proving the pattern for the next.
Automate
Pipelines, infrastructure as code and monitoring, so the new environment is operable rather than merely running.
Optimise
Cost and performance review once real usage patterns exist, then again after the first quarter.
Regulatory frame
What governs this work
References for buyers. Techbanq does not issue certifications, approvals or compliance determinations — those rest with the authority and its assessors.
The full frame in Pakistan- PECA
The Prevention of Electronic Crimes Act, Pakistan's principal cybercrime legislation, including data retention duties placed on service providers.
- SBP technology and security requirements
The technology governance, security and outsourcing requirements applying to banks and payment system operators.
Technologies
What we work with
Cost
What moves the price
We do not publish fixed prices, because any figure quoted before the scope is known is a guess. These are the variables that actually determine it.
Application readiness
Applications that can move as they are cost far less than ones needing re-architecture to run properly in cloud.
Data volume and residency
Large data sets take time to move, and residency rules may force a specific region or a hybrid design.
Downtime tolerance
A migration allowing a maintenance window is materially cheaper than one requiring near-zero downtime.
Current automation
Where deployment is manual today, building the pipeline is a project in itself alongside the migration.
Common questions
What buyers usually ask
Our cloud bill keeps rising. Where do we start?+
With visibility, then the four usual causes: instances sized for a peak that no longer applies, storage and snapshots nobody owns, non-production environments running around the clock, and data transfer between regions or out to the internet. A first review typically finds a meaningful reduction without touching architecture — but we will not quote a percentage before looking at your account.
Can we move to cloud with data residency requirements?+
Usually, but the classification comes first. Once you know which data classes must stay in-country, the architecture follows: in-country regions or on-premise for the restricted classes, cloud for the rest, and a documented boundary between them. Migrations that skip classification are the ones that get unwound.
How long does a migration take?+
It depends on application count and readiness far more than on data volume. A handful of modern applications can move in weeks. An estate with legacy dependencies, undocumented integrations and a low downtime tolerance takes months and should be sequenced in waves so value arrives before the end.
Other services in Pakistan
Related
Discuss cloud and devops in Pakistan
Send us the scope as you understand it today, even if it is incomplete, and we will tell you what we need to know before giving an estimate.
What happens next
- 1We reply within one business day.
- 2A 30-minute scoping call with a senior consultant.
- 3A written proposal with scope, team, and timeline.
Or reach us directly
