Information security for cloud delivery

ISO/IEC 27001
ISO/IEC 27001 certified
The problem
What is usually behind this search
We do not have an office in Abu Dhabi
We serve organisations there from our Riyadh office and our engineering hubs in Lahore and Karachi, travelling for the parts of an engagement that need to happen in person.
The three problems we are usually called about are a migration that stalled, a cloud bill that grew faster than usage, and a release process where deploying is an event rather than a routine. They share a cause: infrastructure that was moved rather than redesigned, and automation that was never built because the migration deadline came first.
Cost is the most visible symptom. A cloud bill rising faster than traffic almost always means over-provisioned instances sized for a peak that no longer applies, storage nobody owns, environments running outside working hours, and data transfer nobody has looked at. These are findable and fixable, but only if someone looks.
Capabilities
What we actually deliver
Cloud migration
Assessment, landing zone design, migration in waves, and cutover with a rollback — sequenced so each wave delivers something rather than everything landing at once.
Landing zone and governance
Account structure, network design, identity, logging, guardrails and tagging set up before workloads arrive rather than retrofitted around them.
CI/CD and release automation
Build, test and deployment pipelines with environment promotion and an automated rollback, so a release is a routine rather than a scheduled risk.
Infrastructure as code
Environments defined in code and version controlled, so what is running matches what was reviewed and can be rebuilt.
Cost optimisation
Right-sizing, commitment planning, storage lifecycle, non-production scheduling and a per-team cost view so spend has an owner.
Reliability and observability
Monitoring, tracing, meaningful alerting, tested recovery procedures and a dependency map that reflects the current system.
Local context
Why this is different in Abu Dhabi
Abu Dhabi buys differently from Dubai. Government entities, the energy sector and the sovereign investment institutions dominate, and all three evaluate slowly, thoroughly, and with governance requirements attached to the outcome. Speed is not the differentiator here; defensibility is.
The energy sector gives the emirate an industrial technology profile alongside its corporate one — operating technology environments, asset-heavy operations and the safety and continuity requirements that come with them. That is closer to Saudi Arabia's Eastern Province than to Dubai's trade economy.
Abu Dhabi Global Market adds a financial-centre layer with its own legal and data protection framework, relevant to any programme handling personal data for an entity registered there.
What buyers in Abu Dhabi run into
- 01
Governance requirements shape the solution, not just the paperwork
Approval, audit and reporting obligations in Abu Dhabi entities affect architecture directly — where decisions are logged, how access is granted, what evidence a system produces by default. Treating governance as documentation added at the end produces systems that fail review.
- 02
Industrial and corporate estates need different operating models
Energy-sector organisations run plant environments and office environments under one CIO. Applying a single security and change model to both either destabilises the plant or leaves the office under-protected. They need separate models with a governed boundary between them.
- 03
Long evaluation cycles reward substantiated claims
With a longer evaluation, unsupported assertions get tested. References are checked, named engineers are asked for, and architectural claims are examined by people who will have to live with the result. Vendors who oversell early are usually eliminated late.
How an engagement runs
The stages, and what happens in each
Assess
Inventory workloads, dependencies, data classification and residency constraints before proposing a target.
Design
Landing zone, network, identity and the operating model for who runs what after migration.
Migrate
Move in waves, lowest risk first, with each wave proving the pattern for the next.
Automate
Pipelines, infrastructure as code and monitoring, so the new environment is operable rather than merely running.
Optimise
Cost and performance review once real usage patterns exist, then again after the first quarter.
Regulatory frame
What governs this work
References for buyers. Techbanq does not issue certifications, approvals or compliance determinations — those rest with the authority and its assessors.
The full frame in United Arab Emirates- UAE Information Assurance Standards
The national information assurance standard, owned by the Cyber Security Council. Applies to entities designated as critical information infrastructure and to government bodies.
- Dubai ISR
The Dubai Electronic Security Center's information security regulation for government and regulated entities operating in the emirate.
- UAE Personal Data Protection Law
The federal personal data protection regime. Free-zone entities in DIFC and ADGM sit under their own separate frameworks instead.
Technologies
What we work with
Cost
What moves the price
We do not publish fixed prices, because any figure quoted before the scope is known is a guess. These are the variables that actually determine it.
Application readiness
Applications that can move as they are cost far less than ones needing re-architecture to run properly in cloud.
Data volume and residency
Large data sets take time to move, and residency rules may force a specific region or a hybrid design.
Downtime tolerance
A migration allowing a maintenance window is materially cheaper than one requiring near-zero downtime.
Current automation
Where deployment is manual today, building the pipeline is a project in itself alongside the migration.
Common questions
What buyers usually ask
Our cloud bill keeps rising. Where do we start?+
With visibility, then the four usual causes: instances sized for a peak that no longer applies, storage and snapshots nobody owns, non-production environments running around the clock, and data transfer between regions or out to the internet. A first review typically finds a meaningful reduction without touching architecture — but we will not quote a percentage before looking at your account.
Can we move to cloud with data residency requirements?+
Usually, but the classification comes first. Once you know which data classes must stay in-country, the architecture follows: in-country regions or on-premise for the restricted classes, cloud for the rest, and a documented boundary between them. Migrations that skip classification are the ones that get unwound.
How long does a migration take?+
It depends on application count and readiness far more than on data volume. A handful of modern applications can move in weeks. An estate with legacy dependencies, undocumented integrations and a low downtime tolerance takes months and should be sequenced in waves so value arrives before the end.
Other services in Abu Dhabi
Related
Discuss cloud and devops in Abu Dhabi
Send us the scope as you understand it today, even if it is incomplete, and we will tell you what we need to know before giving an estimate.
What happens next
- 1We reply within one business day.
- 2A 30-minute scoping call with a senior consultant.
- 3A written proposal with scope, team, and timeline.
Or reach us directly
